Sorry for the lack of updates but we've been doing the same thing for a few weeks. The left wing top skins have been riveted and the J-channel is installed. It was very repetitive but we got into a good rhythmand were able to make quick progress. It is surprisingly hard on the back to rivet the skins so we broke the process down into a couple of smaller chunks.
The outside edge of the wing looking at it from the bottom of the wing.
A close-up of some of the completed rivet work.
A picture of the top of the wing after some of the riveting has been completed.
The outside edge of the wing looking at it from the top of the wing.
Same shot as above without the flash....
You can see a litte more progess hass been made... There are few less cleco's and a few more rivets in place.
Again the same shot as above without the flash....
Close-up of the leading edge and top skin riveted into place.
The riveting of the top skin has been completed.
No comments:
Post a Comment