Today we match drilled the right horizontal stabilizer, counter-sunk the #40 holes in all the HS spars, deburred all #40 holes (#30s were done before). Afterwards we dimpled all the parts, preped them for priming and primed all parts of the horizontal stabilizer,
No comments:
Post a Comment