Saturday, August 30, 2008

Hanger Progress

Phil was off at a Wedding for most of the weekend, so Scott and I went out on the Saturday, and were joined by one of our good friends, Richard, on the Sunday.
We discovered when you get down to two guys working on a project progress is slow. Richard's help was greatly appreciated.
 We made a lot of progress, but there is probably at least one more day of labour required before we will be able to start putting up the steel.

Richard working on some strapping.


 Scott Reloading the nail gun, The gun sure does speed things along at this point.


Darren sitting back, relaxing, and taking it all in.


Yes it is pretty high up. 14 foot walls, and a little over 10 from the top of the wall to the top of the peak.


We made it about half way up both sides of the roof with the strapping, and finished up most of the rest of the bracing.


 A wide angle shot of progress up to this point.
 Scott and I decided to take a well deserved day off on Labour Day.

No comments:

Post a Comment