Another 4.5 hours spent on the empennage.  We finished  prepping the ribs for the horizontal stabilizer and set it aside until  the missing shims arrive.  The vertical stabilizer was assembled, match  drilled and deburred.
Not a lot of pictures for today, and they were posted long after they were taken so I am not really sure about the details.
Darren deburring the edges of a rib.
Scott fluting one of the horizontal stabilizer ribs.
The horizontal stabilizer spars closer to completion than when we started. 



No comments:
Post a Comment