Saturday, December 10, 2011

Installing the 'crotch strap' kit

So that's seriously what it's called. Basically it's the connection for the fifth point of the 5-point harness (vs. the 4 point* harness that's usually in planes). I'm not sure why a non-aerobatic plane requires a 5-point harness but the parts came in the kit and the floor panels were already cut out for the kit so we pretty much had to install it. We also installed another bunch of plate nuts, installed the last few rivets for the main spars, and finished up a few little things in the centre fuselage. This part is getting close to being finished.

* in case you're wondering the 4 points are the 2 sides of the hips and 2 shoulders.

December 10, 2011

Saturday, December 3, 2011

Okay, we've actually been working, I swear

We've been working over the last few months on the centre fuselage. It certainly felt like we stalled but, considering that this is the part of the airplane where the wings join, all the controls connect, and, most importantly, we sit, it stands to reason that it would be complicated and have a lot of parts. We've now finished assembling the main part of the centre fuselage. We have some final steps for the side ribs but we're almost ready to join the centre fuselage to the tailcone.

October 6, 2011

A little time off for some more work on Scott's back yard. October 8, 2011
October 15, 2011

November 13, 2011

November 26, 2011

November 26, 2011

November 28, 2011

December 3, 2011

December 3, 2011

Sunday, September 18, 2011

More Prep Work

Today we spent our time completing the dimpling, sanding, cleaning and priming of the rest of the parts for the centre fuselage. There are a large number of parts in this section so it took a remarkably large amount of time to get all the parts done. Next we'll start assembling the centre fuselage -- a task that is expected to take a few weeks.


Took some time to work on Scott's back yard. August 13, 2011

August 20, 2011

August 27, 2011

September 19, 2011

Thursday, August 4, 2011

A big step forward and now a seemingly step backwards

Tonight we spent a few more hours working on the centre fuselage. Specifically we worked on the spot in the fuselage where the wings attach. We bolted the spacer blocks between the two sides of the wing attach bulkhead (F-904 for those who are following the part numbers) and low and behold everything lined up perfectly with the bottom skin. We then clecoed everything together, match-drilled all the remaining parts and then set about disassembling the entire assembly.

The spacers bolted in place

After everything  has been disassembled for deburring, and dimpling.

Monday, August 1, 2011

Enough is enough

So today was the breaking point in this (relatively) new workshop. Now that we know how we need to work we decided to bite the bullet and use today to organize and rearrange the workshop. After we rearranged the storage location for the wings we were able to move some of the alleged woodworking tools around. (I say alleged because they've cut more aluminum then wood.) That freed up some wall space for us to put up some wall paper (aka sheets of plans). Until now we were losing a workbench to the plans -- what a waste of horizontal work space. Well now the workshop is much better organized and will work for the entire fuselage build.

Post clean-up shot #1

Post clean-up shot #2

Post clean-up shot #3


Saturday, July 30, 2011

There's an awful lot of woodworking for an all metal plane...

Today was a good day in the shop. We spent the morning doing something that we should've done a year ago when we built the 904 bulkheads (that's the place where the wings attach). We had to make some spacers that were precisely 1 17/16". Luckily I bought a planer about 4 years ago. Unluckily, it was still in the box. Once we cut some 3/4" MDF and glued it together we then set about putting the planer together. It was pretty straightforward and I must say that I'm pretty impressed with the Rigid planer (I bought it when I was living in the states and paid about 50% of the price I would've paid in Canada -- who could pass up that deal?!?)

Once that was done I cut the spacer blocks and drilled them out. We'll need them when we bolt the bulkheads together and get them setup for match-drilling.

While I was doing woodwork, Darren was concentrating on cutting some holes and getting the parts setup for the steps. The instructions weren't the best so it took some head scratching and figuring but it's pretty much ready to go.

That's where we ended today but we're going to try to get some more work in on Monday.

Rough pieces after being cut out.

After final manufacturing.

A close up of some of our work.

Scott at work creating the required spacer blocks.

The planer

Monday, July 18, 2011

So, we've actually worked since this last post

I thought that I'd put up a little update. We have done some work since the last post. We've match drilled the whole centre fuselage and also worked on manufacturing some attach pieces and modifying some additional ribs. Unfortunately, the pictures pre-match drilling and post-match drilling look almost identical except the clecos have moved one hole. We didn't do any work this last weekend since we decided to take a trip to Hamilton to watch the Riders. We don't want to talk about the game.