Friday, January 28, 2011

Fuel tank completion and Trim tab

Today we finished up the fuel tanks.  We first finished up the wiring for the fuel sensors (we needed some additional connectors) and did the final work on installing the fuel pick up tubes.  Once that was done we worked on the assembly of the trim tab.  The first problem was to bend over the end flaps.  We've certainly developed a lot of confidence with metal working and the trim tab looks pretty good (if we do say so ourselves).  We did some basic assembly and have set the trim tab aside for the inspector.  Speaking of the inspector, the paperwork has been submitted and we're waiting for a call to setup the appointment.  We been told that it takes weeks so we're not getting too excited (yet).  We'll move back to the fuselage in the interim.
 
January 22nd
 
Image
Interior tank shot following installation of the fuel pickup tube.
 
Image
 
Exterior tank shot following installation of the fuel pickup tube. 
 
Image
On to the trim tab.
 
Image
Our trim tab bending tool.
 
Image
Darren working the drill.
 
Image
Our new drill we picked up at Air Venture in Oshkosh, but have not included in a picture yet.
 
Image  
 
Darren cleaning up the trim tab prior to priming it.
 
January 29th
 
Image
Bending in the sides of the trim tab.
 
Image
Scott bending in one side of the trim tab.
 
Image
The finished product.
 
Image
Darren trying to look busy.
 
Image
The trim tab after assembly is complete.
 
Image
A close up of the trim tab.
 
Image
The trim tab from another angle.
 
Image
The fuel sensor plate we were able to complete after receiving the missing sensor.

Friday, January 21, 2011

Fuel tank vent line and sensors

We spent time this weekend working on the "plumbing" for the fuel tank.  As you can imagine the fuel tank needs a vent line installed so that as fuel in removed from the tank it doesn't collapse (think of sucking juice of a juice box, without air coming in the box collapses).  We used our flaring tool and straightened out a coil of the vent line.  We also started work on the wiring for the fuel sensors and installed the sensing plates.  We ran out of a few electrical components that we'll order and have for the next building session.
 
Image
Scott using the flaring tool on the vent line.
 
Image
Interior shot of the tank where the vent line attaches.
 
Image
 Exterior shot of the tank where the vent line attaches.
 
Image
The fuel sensor plate.
 
Image
A shot of the vent line after some wiring has been completed.

Saturday, January 15, 2011

Shop is finally finished - worked on fuel tanks

Well, after many weekends of effort insulating the attic (it was just too cold to work), installing lights and organizing, the shop we're back at it.  Today we installed another space heater and the last two lights.  After that we spent around 3 hours working on some of the last details of the two fuel tanks.  We started on the fuel tank vent lines by installing the fittings in the end of the tank.  It was also time to start on the wiring for the fuel sensors.  Those fittings were installed on the tank as well.  Of course, we needed to mix up some more proseal to ensure that the tank doesn't leak.  I'll admit that the tank leaking is my biggest worry. 
 
 Image
 
A photo of one of the tanks with the fuel vent line (the blue one) fitting installed.  You can also see the capacitive fuel sensor connector.  I drew a red box around the parts because I felt like getting fancy. :-)
 
Image
 
This is the inside of the fuel tank.  You can see the fuel vent line fitting and the sensor wire.  All the grey stuff is the fuel tank sealant.  
 
I tried to take a picture of the fuel tank vent lines (we used our flaring tool for the first time) but for some reason my camera couldn't focus properly. 
 
We would've installed the end plates and fuel pick up tubes today but we are missing a couple of nuts (no comments from the peanut gallery).  Those are on order from Aircraft Spruce in Toronto so hopefully they'll arrive shortly.

A Few Hangar Pictures

Phil (the other half of the hangar) finished his plane earlier this year and took me(Scott) up for a ride just before Christmas.  I managed to snap a few photos of the hangar overhead.
 Image
Here's an overhead of the airport (at least our side with the hangars)
Image
I circled our hangar to make it easier to see

Thursday, November 11, 2010

Finally back in the shop

Well, let's just say that the move didn't go so well.  Less than a week after moving into my new house, Darren and I were starting to insulate and hang drywall in the workshop.  After a crash, xrays and a doctor setting the break, I spent the next 6 weeks in a cast for a broken wrist and the month after that getting mobility and strength back.  But, the shop is now finished and we got back at the plane this past weekend.  We've decided to do the last few things on the empennage and wings so that we can have the inspector come.  So, you won't see any major new parts for a little while because once the inspection is finished we're going to close up all the horizonal stabilizer, vertical stabilizer, elevators, rudder, fuel tanks, ailerons, and flaps.  All the parts are ready for the final work and it will be nice to have parts completed. 


Scott working on one of the fuel tanks.


The fuel tank.


Scott gearing up for some priming, or possibly mixing up some tank sealant.


The bracket primed and riveted in place.


Another of the bracket.


Our new bucking bar

Monday, July 26, 2010

EAA AirVenture

We ended up in Oshkosh Wisconsin this summer for EAA Air Venture.
One of the goals of the trip was to get some paint ideas for the plane.
I might through some other picture from the trip up later, but for now here are some fo the paint schemes we liked.









Saturday, May 22, 2010

Bulkheads are finished

Today we wrapped up the last few bulkheads for the fuselage.  We started off by finishing up the match drilling we started on Thursday night.  There wasn't a lot of manufacturing to do today, we finished most of those tasks on Thursday.   After that we began the long process of edge sanding, deburring and sanding all of the parts.  After we cleaned a primed all the parts, we assembled the remaining bulkheads.  We were finishing up the last few rivets when the power failed.  The good thing about air tools is that the tank gives you a certain amount of buffer.  Anyways, the power was out for about 30-40 minutes so we started packing up the workshop.  When the power came back we finished up the last few rivets and wrapped up our packing tasks.  The workshop is mostly ready to be moved.